Interactive demo — sample plant data. Changes stay in this browser only.

Start here: Conveyor Belt A · Inventory AI · Ask AI

All job plans
InstrumentationPreventiveCorrectiveGeneral

Pressure Transmitter Calibration Check

Verify and adjust field pressure transmitters against a calibrated reference.

Estimated time

1.5 hours

Craft required

1 technician(s)

Skill level

journeyman

Procedure steps

  1. 1

    Place loop in manual / bypass as required

    ~10 min
  2. 2

    Isolate transmitter and connect calibrator

    ~15 min
  3. 3

    Apply 0%, 50%, 100% span; record as-found

    ~25 min
  4. 4

    Adjust zero/span if out of tolerance; record as-left

    ~20 min
  5. 5

    Return to service and verify DCS reading

    ~10 min

Safety notes

  • Isolate process impulse lines before opening
  • Bleed trapped pressure

Tools

  • Hand pump / calibrator
  • HART communicator
  • Multimeter

Parts

  • Isolation valve seals
  • Impulse tubing fittings