Interactive demo — sample plant data. Changes stay in this browser only.

Start here: Conveyor Belt A · Inventory AI · Ask AI

All job plans
ElectricalCorrectiveGeneral

VFD Fault Troubleshooting

Corrective workflow for diagnosing and clearing common VFD faults and trip conditions.

Estimated time

2 hours

Craft required

1 technician(s)

Skill level

specialist

Procedure steps

  1. 1

    Record active fault code and operating conditions

    ~10 min
  2. 2

    Check input voltage balance and grounding

    ~15 min
  3. 3

    Inspect cooling fans and heat sink for blockage

    ~15 minLOTO required
  4. 4

    Megger motor leads if ground fault indicated

    ~20 minLOTO required
  5. 5

    Clear fault, test run under load, document root cause

    ~20 min

Safety notes

  • Wait for DC bus discharge before opening drive
  • Follow OEM wait time

Tools

  • Laptop / VFD keypad
  • Clamp meter
  • Multimeter

Parts

  • Cooling fan (if failed)
  • Input line reactor (if applicable)